icon_pdf

Making stream of production Introduction

Recently I have got the questions about the method of the introduction and stability of TPS from my Spanish friend. On the other hand I have seen many failure cases of the introduction.
And in this opportunity I wish to describe the way of introduction and stabilize TPS from the point of view of the “Making Stream of Production”.

The way of TPS. Introduction (Donwload)

 

1) The meaning of “making stream of production"
icon_pdf_negro
2) LT
icon_pdf_negro
3) About TOC
icon_pdf_negro
4) Tact Time
icon_pdf_negro
5) Toyota Style "Standardization"
icon_pdf_negro
6) Thinking of standardization
icon_pdf_negro
7) Small Demand
icon_pdf_negro
8) Small Demand-2
icon_pdf_negro
9) Small demand and constraint process
icon_pdf_negro
10) Small demand and constraint process -2
icon_pdf_negro
11) Small demand and constraint process - The Visual Control
icon_pdf_negro
12) Small demand and constraint process - 3
icon_pdf_negro
13) Kanban System
icon_pdf_negro
14) Kanban System -2
icon_pdf_negro

All these works are licenced under the Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0). To view a copy of this license, visit https://creativecommons.org/licenses/by-nc-nd/4.0/deed.es  and http://creativecommons.org/licenses/by-nc-nd/4.0/ and https://creativecommons.org/licenses/by/4.0/legalcode  The Factory Management Institute. Author: SENSEI Koichi Kimura. Japan 2011-2016